The first park includes a ability of two hundred MW though Sandrini II features a capability of one hundred MW. The overall expense of both of those projects were not disclosed even so, through design, above 200 workers had been employed. The tasks are expected to determine A few positions https://californiasolarpowersystems.health.blog/2024/08/23/why-should-you-buy-maintenance-services-from-solar-companies-fresno/